Created with Fabric.js 1.4.5 2nd Step 1st Step Residential Constriction Process Find a locations and purchase the land - One of the first steps to building a house is finding the foundation to build it on and then purchasing it. Lay down foundation and then clean and prepare site - Using a backhoe and a bulldozer to clear the site of rocks, debris and trees. Then level the site, by digging holes and trenches. Inspection - A city inspector will visit the site to make sure foundation components are up to code and installed properly. Complete framing - The floor, walls and roof are completed. Plywood covering is applied to the exterior walls and roof. Windows and exterior doors are installed. The covering is then covered with a protective barrier knownas a house wrap. Complete plumbing, electric and HVAC (heating, ventilation, and air condition) - The siding and roofing are installed. At the same time, contractors start running pipes and wires through the walls, ceilings and floors. Vents, as well as water supply lines, are installed. Bathtubs and shower/tub sections are put in place. The electricians will also install electric for outlets, lights and switches. Inspection for the plumbing, electric and frame - Framing, plumbing and electrical systems are inspected for consent with building codes. Install insulation - Install the blanket insulation. Put in drywall and finish other interior textures - The Drywall is hung and taped. The paint is then applied after taping is complete, Then begin installing exterior finishes such as brick, stone and siding. Install/Finish interior trim and exterior driveways and walkway - Interior doors, window sills,stair banisters are installed, As well as cabinets. Walls get a finish coat of paint, Then the pour of the driveway starts as soon as the foundation is completed. Install countertops and flooring - Ceramic tile and wood flooring are installed as well as countertops. Finish exterior landscaping - Trees, shrubs and grass are planted and other exterior landscaping completed. Install electrical trim and install bathroom fixtures - Light fixtures, outlets and switches are installed and the electrical panel is completed. Sinks and toilets are also put in. Install mirrors, and shower doors -Mirrors, shower doors and carpeting are installed, and final cleanup will start taking place. Make sure everything's clean and ready for inspection - Clean the interior and exterior of the house so its read for inspection and presentable for walkthroughs. Final inspection and walkthrough - A building-code official completes a final inspection and issues a certificate of occupancy. Then the builder will walk through the new home to inform the new home owners with its features and the operation of the houses multiple systems andcomponents, and explain their responsibilities formaintenance and as well as warranty coverage and procedures. 3rd Step 4th Step 5th Step 6th Step 7th Step 8th Step 9th Step 10th Step 11th Step 12th Step 13th Step 14th Step 15th Step
Create Your Free Infographic!